stacyd_20160921.plan

Sep 21, 2016

Most of construction is done in the studio now. Still need to move in the A/V rack and setup the streaming PC on it, and still need the shelves in the closet and a couple more plastic drawers, but essentially the space is workable now. It's nice having all the power tools powered up at all times, with a few empty power strips to spare so that I can always walk up and use any tool or plug new things in.

Over the last couple of weeks, I've been completing designs for the interior of the secondary ship so that I can build the interior models, which I plan to begin work on this week and the upcoming weekend. I recently took several dozen photos inside a battleship and submarine, and plan to integrate the interior detailing seen there, combining with the space-age industrial feel of the Nostromo from Alien. The ideas are flowing.

Comments

Comments are closed.